Chollada Soonyakanit, EI.

 

 
 

 

 

 

ENGINEER INTERN

hr eNGINEERING sERVICES, iNC.

 

 

Years of Experience

9

Education

MS, Civil Engineering, 2018, University of Florida, FL

BS, Civil Engineering, 2011, Chulalongkorn University, Bangkok, Thailand  

Key Qualifications

Geotechnical Engineer with more than 10 years of experience ranging from professional services to academic research. He served as a Project Manager on various types of geotechnical services including earthwork, foundation/floor slab design, pavement evaluation/design, dynamic analysis, earth retaining structure design, site characterization, soil stabilization, and subsurface exploration.

Relevant Experience

Geotechnical Engineer with 9 years of experience including performing geotechnical projects and geotechnical research. Since joining HR Engineering Services, she has been extensively involved with all drafting of core borings, soil parameters estimation for substructures, axial analyses of deep foundations, settlement analyses, and preparation of geotechnical reports.

SR 5/US-1 Long Key Bridge over Long Key Channel – FDOT D6 - FPID No. 448206-1-22-01

Monroe County, Florida.

The project consists of the preparation of 30% project design plans for both a new bridge and roadway reconstruction for the planned design-built teams. Based on new FDOT requirements, all geotechnical services need to reach 100% completion. The project consists of land and overwater geotechnical field exploration. All land work has been completed and the water work will start in the winter of 2023. The water work will be conducted for 70 new bridge piers. At each pier location one SPT boring and rock core borehole will be performed. A preliminary geotechnical report has been submitted for preliminary pier foundations

Client: Stantec Consulting, Inc

Project Manager: Elizabeth Beam MS, AICP, ENV SP

(407)627-9772

 

SR 5/ Overseas Highway Over Channel 5 Bridge #900098 Rehabilitation- FDOT D6 -FPID No. 436523-1-52-01

Monroe County, Florida.

This project consists of the repair of the existing bridge piers having concrete cracking/spalling of the column piers. The geotechnical scope consists of the performance of SPT and rock cores at 8 selected locations. The geotechnical information provided by the boreholes will be used to back calculate the actual capacity of the drilled shafts supporting the bridge as an attempt to determine if additional loading can be placed on the existing foundation.

Client: BCC Engineering, LLC.

Project Manager: Bob Forand

(954)928-1828

 

SR 826/Palmetto Expressway, from East of NW 32nd Avenue to West of NW 17th Avenue–Segment 6– FPID No. 435760-6-52-01

Miami-Dade County, Florida.

Provided support for all the field exploration and geotechnical design including foundation design and soil parameters for sign structures, mast arm, ADMS, and gantry structures.

Client: FDOT/Jacobs

Project Manager: Joseph Martin

(954)513-1543

 

SR 5/ US-1 Interchange at NE 203rd Street – FPID No. 433511-1-22-

Miami-Dade, Florida

Provided support for all the field exploration and geotechnical design, axial analysis for drilled shafts and micropile, settlement calculations of MSE walls, and the soil parameters for mast arms and sign structures.

Client: FDOT/AECOM

Project Manager: Samuel Worthy

(305)262-7466

 

Golden Glades Interchange Various Ramp Improvements – FPID No. 428358-4-52-01

Miami-Dade County, Florida

Provided all the field, laboratory, the settlement analysis and soil parameters for the proposed sign structures and high mast structures.

Client: FDOT

Project Manager: Adrian Viala

(954)677-7011

 

I-395 from I-95 to Macarthur Causeway – FPID No. 251688-1-52-01

Miami-Dade County, Florida

Provided support for all the field exploration and geotechnical design including foundation design, settlement analysis, and soil parameters for sign structures and light pole structures.

Client: FDOT/ Pevida Highway Designers

Project Manager: Walfrido Pevida

(786)228-5666

 

SR 93/I-75 Rest Area – Alligator Alley between MP29.200 and MP29.910 – FPID No. 437934-2-52-01

Broward County, Florida

Provided support for all the field exploration and geotechnical design including soil parameters for high mast structures and light pole structures.

Client: FDOT/EAC Consulting, Inc.

Project Manager: Rodney C. Devera

(305)265-5462

 

SR 5/US-1, from Northlake Boulevard to Anchorage Drive New Bridge over Earman River – FPID No. 442891-1-52-01

Palm Beach County, Florida

Provided support for all the field exploration and geotechnical design of the project for the widening/or new construction of the bridge over the Earman river. Providing support for geotechnical design including the bridge, settlement analysis, and soil parameters for mast arm structures and the percolation test results.

Client: FDOT

Project Manager: Rocio Merlihan

(954)677-7030

 

    BACK HOME